L'emploi des métiers de l'électricité Site d'emploi en électricité et connexes : électroniques, mécaniques, automatisme...
  1. Accueil 1
  2. > Espace CVthèque 2
  3. > CV Ingénieur en électromécanique - EL1212261246 3
Retour à la CVthèque
CV Ingénieur en électromécanique
Mohamed Salah H.

Ingénieur en électromécanique

3 ans d'expérience
Obtenir lesses coordonnées de ce profil

Contact

Réf. EL1212261246
Né le 11/04/1982
21000 Skikda
Algerie
1982-04-11 Male Skikda Toute la France Algerie 21000 Skikda

Langues

Arabic mother tong./ French very good. / English good

Ma recherche

Je recherche tout type de contrat, sur la France et étranger, dans l'Ingénierie.

Formations

June 2008: diploma of state: Industrial Engineer in Electro mechanics, Skikda university

Expériences professionnelles

2011
QA/QC Welding engineer in (SNC LAVALIN International )
- Duration: from (July 2011- to till now)
- Project: installation of gas treatment for Rhourde Nouss fields ILLIZI
Duties:
• Responsible to witness PQR and WQT.
• Responsible on checking materials to be used in the fabrication shop.
• Responsible for dimensional check prior to welding.
• Responsible for visual inspection of welding.
• Familiar with ASME welding codes and NDT procedure / technologies.
• Prepare test Packages document prior to test.
2010
QA/QC piping in (ETB/MIK) (RED SEA)-(SAMSUNG ENGINEERING CO.LTD)
- Duration: from (December 2010- July 2011)
- Project: Construction of A/G Piping SKIKDA REFINERY REHABILITATION AND ADAPTATION PROJECT (SONATRACH ACTIVITE AVAL-DIVISION RAFFINAGE)
Duties:
• Responsible on checking materials to be used in the fabrication shop.
• Responsible for dimensional check prior to welding.
• Responsible for visual inspection of welding.
• Following up NDT process according to Project ITP'S.
2009
Duration: from (February 2009- December 2010)
- QA/QC piping in (ORASCOM CONSTRUCTION ) - (KBR) Algeria
- Project: Construction of Under Ground Piping Systems (Skikda New LNG Train)
Duties:
• Receiving Material , Reviewing Drawings
• Prepare (Test Packages , ITP's , WPS, PQR and WQT)
• Following up work shop fabrication and site Erection. By ensuring that all processes are matching with approved Procedures.
• Following up NDT process according to Project ITP'S.
• Following Up Hydrostatic test.
• Following Up Insulation, sandblast and Painting.
• Prepare the Final Documentation of the project ( Test Packages and Loops)
2003
August 2003- February 2009:
Globe transit:
• Declaring in customs:
Management of files import / export.
Prepare the statements (declarations) import and export on system.
Follow-up of files with the services of customs.

Langues

Arabic mother tong./ French very good. / English good
Obtenir ses coordonnées
Les cookies permettent d'améliorer votre navigation

ELECTRIJOB utilise les cookies sur son site, dont des cookies d'analyse d'audience. En poursuivant votre navigation sur ce site, vous acceptez notre utilisation de cookies, nos CGV / CGU et notre politique de confidentialité pour vous proposer des services adaptés à vos centres d'intérêt et réaliser des statistiques de visites.